Control Circuit Inspection

2010 Kia Rondo LX, 2.7 6SECTION Control Circuit Inspection
  1. Check voltage
    1. IG "OFF" and disconnect injector connector.
    2. IG "ON" and ENG "OFF"
    3. Measure voltage between terminal 2 of injector harness connector and chassis ground.
      1. Specification: Approx. 0V
        Fig 1: Measuring Voltage Between Terminal 2 Of Injector Harness Connector & Chassis Ground
        G06488995Courtesy of KIA MOTORS AMERICA, INC.
    4. Is the measured voltage within specification?

      YES

      NO

      • Go to "Β 2 Check for short to battery in harness" as follows.
  2. Check for short to battery in harness
    1. IG "OFF" and disconnect injector connector and PCM connector.
    2. Measure resistance between terminals 1 and 2 of injector harness connector.
      1. Specification: Below 1Ξ©
        Fig 2: Measuring Resistance Between Terminals 1 & 2 Of Injector Harness Connector
        G06488996Courtesy of KIA MOTORS AMERICA, INC.
    3. Is the measured resistance within specification?

      YES

      NO

RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.