Power Circuit Inspection

2005 Hyundai Santa Fe GLS, 2.7 D, AWDSECTION Power Circuit Inspection
WARNING: This page is about a different variant/trim than selected.
  1. Ignition "OFF"
  2. Disconnect TPS connector.
  3. Ignition "ON" & Engine "OFF"
  4. Measure voltage between terminal 1 of the TPS harness connector and chassis ground.

    Specification : Approx. 5V

    Fig 1: Measuring Voltage Between Terminal 1 Of TPS Harness Connector And Chassis Ground
    G03845614Courtesy of HYUNDAI MOTOR CO.
  5. Is the measured voltage within specifications?

    YesΒ 

    NOΒ 

RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.