Signal Circuit Inspection

2010 Kia Rondo LX, 2.7 6SECTION Signal Circuit Inspection
  1. IG "OFF" and disconnect HO2S (B1/S2) connector.
  2. IG "ON" and ENG "OFF"
  3. Measure voltage between terminal 1 of HO2S (B1/S2) harness connector and chassis ground.
    1. Specification:

      Approx. 3.5V - when pumping current is ON

      Approx. 0.45V - when pumping current is OFF

      Fig 1: Measuring Voltage Between Terminal 1 Of HO2S (B1/S2) Harness Connector & Chassis Ground
      G06488803Courtesy of KIA MOTORS AMERICA, INC.
  4. Is the measured voltage within specification?

    YES

    1. Go to "GROUND CIRCUIT INSPECTIONΒ " procedure.

    NO

    1. Repair open in harness, then go to "VERIFICATION OF VEHICLE REPAIRΒ " procedure.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.