Power Supply Circuit Inspection

2010 Kia Rondo LX, 2.7 6SECTION Power Supply Circuit Inspection
  1. Ignition "ON".
  2. Measure voltage between terminal "1" of the wheel speed sensor (RL) harness connector and chassis ground.
    1. Specification : Approx. B+
    Fig 1: Measuring Voltage Between Terminal 1 Of Wheel Speed Sensor (RL) Harness Connector And Chassis Ground
    G06487441Courtesy of KIA MOTORS AMERICA, INC.
  3. Is the measured voltage within specifications?

    YES

    1. Go to "SIGNAL CIRCUIT INSPECTIONΒ " procedure.

    NO

    1. Check for open or short to GND in wheel speed sensor harness (FL) between terminal "1" of the wheel speed sensor (FL) harness connector and terminal "44(ESC), 5(ABS)" of the HECU harness connector. Repair as necessary and then go to "VERIFICATION OF VEHICLE REPAIRΒ " procedure.
    2. If OK, Substitute with a known-good HECU and check for proper operation. If problem is corrected, replace HECU and then go to "VERIFICATION OF VEHICLE REPAIRΒ " procedure.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.