Control Circuit Inspection

2011 Hyundai Santa Fe GLS, 3.5 G, AWDSECTION Control Circuit Inspection
  • Check open in harnessΒ 
    1. IG "OFF" and disconnect VCMA connector and ECM connector.
    2. Measure resistance between VCMA commend signal terminal of VCMA harness connector and VCMA commend signal terminal of ECM harness connector.

      Specification :Β  Approx. below 1Ξ©.

      Fig 1: Measuring Resistance Between VCMA Commend Signal Terminal Of VCMA Connector And VCMA Commend Signal Terminal Of ECM Connector
      G06842819Courtesy of HYUNDAI MOTOR CO.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.