Ground Circuit Inspection

2005 Hyundai Santa Fe GLS, 2.7 D, AWDSECTION Ground Circuit Inspection
WARNING: This page is about a different variant/trim than selected.
  1. Check for open in harness
    1. Ignition "OFF"
    2. Disconnect MAFS connector and PCM connector.
    3. Measure resistance between terminal 3 of the MAFS harness connector and chassis ground.

      Specification : Approx. below 1Ω

      Fig 1: Measuring Resistance Between Terminal 3 Of MAFS Harness Connector And Chassis Ground
      G03845395Courtesy of HYUNDAI MOTOR CO.
    4. Is the measured resistance within specifications?

      YES 

      NO 

      • Check open in harness between MAFS connector and PCM connector.
      • Repair or replace as necessary and then, Go to "VERIFICATION OF VEHICLE REPAIR " procedure.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • You smell fuel, burning insulation, or see smoke.
  • Brakes feel soft, pull hard to one side, or make grinding noises.
  • The engine overheats, stalls repeatedly, or misfires under load.
  • You are missing required tools, torque specs, or safe lifting equipment.
  • You are not confident in the next step or safety outcome.