Installation Procedure

2008 Chevrolet HHR LT, 2.4 P, AutomaticSECTION Installation Procedure
WARNING: This page is about a different car, the 2011 GMC Canyon and 2011 Chevrolet Colorado. However, it is still accessible from the selected car via links, so may be relevant.
    Fig 1: View Of I/P Compartment Assembly
    GM1251630Courtesy of GENERAL MOTORS CORP.
  1. Position the I/P compartment assembly to the I/P.
  2. Close and fully latch the I/P compartment door.
  3. CAUTION: Refer to Fastener Caution .
  4. Install the fasteners retaining the I/P compartment assembly to the I/P. Tighten the fasteners to 3 N.m (27 lb in).
  5. Ensure the alignment of the door allows for proper operation.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.