Installation Procedure

2006 Chevrolet Chevy Express G2500, Van Cargo Extended, 5.3 T, 4L60E/M30SECTION Installation Procedure
    Fig 1: Instrument Cluster & Screws
    GM328138Courtesy of GENERAL MOTORS CORP.
  1. Position the instrument cluster (1) to the vehicle.
  2. NOTE: Refer to Fastener Notice in Cautions and Notices.
  3. Install the screws (2) that retain the instrument cluster to the instrument panel carrier.

    Tighten:Β  Tighten the screws to 2 N.m (18 lb in).

  4. Install the instrument panel cluster trim plate. Refer to Trim Plate Bezel Replacement - Instrument Panel (I/P) ClusterΒ .
  5. Tilt the steering column to the up position, if equipped with tilt steering.
  6. Connect the battery negative cable. Refer to Battery Negative Cable Disconnect/Connect Procedure in Engine Electrical.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.