Principle Of Operation

1999 BMW 328i 2D Convertible, AutomaticSECTION Principle Of Operation

Battery Voltage  is monitored by the ECM for fluctuations. It will adjust the output functions to compensate for a lower (6v) and higher (14v) voltage value. For example, the ECM will:

  • Modify pulse width duration of fuel injection. 
  • Modify dwell time of ignition. 

When KL15  is switched "on" the ECM is ready for engine management. The ECM will activate ground to energize the Engine Control Module Relay. The Engine Control Module Relay supplies operating voltage to the ECM and the previously mentioned operating components. MS43 - Five seconds after the ignition is switched on and the voltage at the KL15 input is <9 volts, the ECM compares the voltage to the ECM Relay supplied voltage. If the voltage difference between the two terminals is greater than 3 volts, a fault code will be set.

When KL15  is switched "off" the ECM operating voltage is removed. The ECM will maintain a ground to the Engine Control Module Relay for a few seconds to maintain ignition coil activation (MS43 Emission Optimized).

Ground  is required to complete the current path through the ECM. The ECM also:

  • Internally links a constant ground (1) to the Engine Sensors. 
  • Switches ground (2) to activate components. 
Fig 1: Identifying Engine Sensors
G03394294
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • You smell fuel, burning insulation, or see smoke.
  • Brakes feel soft, pull hard to one side, or make grinding noises.
  • The engine overheats, stalls repeatedly, or misfires under load.
  • You are missing required tools, torque specs, or safe lifting equipment.
  • You are not confident in the next step or safety outcome.