Installation [08/2015 - ]: Procedure

2018 Toyota 4Runner SR5, 4WDSECTION Procedure
  1. INSTALL BACK DOOR POWER WINDOW REGULATOR SWITCH ASSEMBLY 
    1. Attach the 2 claws to install the regulator switch.
  2. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 3 [08/2015 - 08/2019] , or refer to PROCEDURE - Step 3 [08/2019 - ]

  3. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for VF2A) 

    Refer to PROCEDURE - Step 4 [08/2015 - 08/2019] , or refer to PROCEDURE - Step 4 [08/2019 - ]

  4. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 5 [08/2015 - 08/2019] , or refer to PROCEDURE - Step 5 [08/2019 - ]

RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • You smell fuel, burning insulation, or see smoke.
  • Brakes feel soft, pull hard to one side, or make grinding noises.
  • The engine overheats, stalls repeatedly, or misfires under load.
  • You are missing required tools, torque specs, or safe lifting equipment.
  • You are not confident in the next step or safety outcome.