Safety Warning
DIY auto repair can cause serious injury, fire, or vehicle damage. These guides are for informational purposes only. Always follow OEM torque specs, wear PPE, and consult a certified mechanic if you are unsure. You are solely responsible for your safety.
SYS.OK|MANUAL.DBβ LIVE
HOMESERVICE MANUALSTOYOTA2011LANDCRUISER V8-5.7L (3UR-FE)REPAIR AND DIAGNOSISPOWERTRAIN MANAGEMENTCOMPUTERS AND CONTROL SYSTEMSTESTING AND INSPECTIONCOMPONENT TESTS AND GENERAL DIAGNOSTICSFUEL INJECTOR CIRCUIT
2011 Toyota Landcruiser V8-5.7L (3UR-FE)
Fuel Injector Circuit
2011 Toyota Landcruiser V8-5.7L (3UR-FE)SECTION Fuel Injector Circuit
3UR-FE ENGINE CONTROL: SFI SYSTEM: Fuel Injector Circuit
- Fuel Injector Circuit
DESCRIPTION
The fuel injectors are located on the intake manifold. They inject fuel into the cylinders based on the signals from the ECM.
WIRING DIAGRAM
INSPECTION PROCEDURE
NOTICE:
Inspect the fuses for circuits related to this system before performing the following inspection procedure.
PROCEDURE
1. CHECK INJECTOR ASSEMBLY (POWER SOURCE)
(a) Disconnect the fuel injector connector.
(b) Turn the engine switch on (IG).
(c) Measure the voltage according to the value(s) in the table below.
Standard Voltage:
NG -- INSPECT FUSE (INJ, IG2 MAIN)
OK -- Continue to next step.
2. INSPECT FUEL INJECTOR ASSEMBLY
(a) Inspect the fuel injector Testing and Inspection.
NG -- REPLACE FUEL INJECTOR ASSEMBLY Removal
OK -- Continue to next step.
3. CHECK HARNESS AND CONNECTOR (FUEL INJECTOR ASSEMBLY - ECM)
(a) Disconnect the fuel injector connector.
(b) Disconnect the C53 ECM connector.
(c) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- REPLACE ECM Removal
4. INSPECT FUSE (INJ, IG2 MAIN)
(a) Remove the INJ fuse and IG2 MAIN fuse from the engine room relay block.
(b) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
NG -- CHECK FOR SHORT IN ALL HARNESSES AND CONNECTORS CONNECTED TO FUSE AND REPLACE FUSE
OK -- Continue to next step.
5. INSPECT INTEGRATION RELAY (IG2)
(a) Inspect the integration relay Testing and Inspection.
NG -- REPLACE INTEGRATION RELAY
OK -- REPAIR OR REPLACE HARNESS OR CONNECTOR (INTEGRATION RELAY - FUEL INJECTOR ASSEMBLY)
RENDER: 1.0x
NO RELATED
Recommended Tools & Savings
Use the Manual With the Right Hardware
Pair factory procedures with proven DIY tools so the instructions are easier to execute.
Affiliate disclosure: We may earn a commission at no extra cost to you.
When to See a Mechanic
Stop DIY work and contact a certified mechanic immediately if any of the following apply:
- β’ You smell fuel, burning insulation, or see smoke.
- β’ Brakes feel soft, pull hard to one side, or make grinding noises.
- β’ The engine overheats, stalls repeatedly, or misfires under load.
- β’ You are missing required tools, torque specs, or safe lifting equipment.
- β’ You are not confident in the next step or safety outcome.