Purge Valve: Installation

2009 Toyota FJ Cruiser RWDSECTION Installation
  1. INSTALL DUTY VACUUM SWITCHING VALVE 
    1. Connect the hose to the vacuum switching valve.
    2. Install the vacuum switching valve with the bolt.

      Torque: 9.0 N*m (92 kgf*cm, 80 in.*lbf) 

      Fig 1: Identifying Vacuum Switch Valve With Bolt
      G05109758Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Connect the vapor feed hose.
      Fig 2: Identifying Vapor Feed Hose
      G05109759Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    4. Connect the connector.
  2. INSTALL V-BANK COVER  (See INSTALLATION )
  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 

    Torque: 3.9 N*m (40 kgf*cm, 35 in.*lbf) 

RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • You smell fuel, burning insulation, or see smoke.
  • Brakes feel soft, pull hard to one side, or make grinding noises.
  • The engine overheats, stalls repeatedly, or misfires under load.
  • You are missing required tools, torque specs, or safe lifting equipment.
  • You are not confident in the next step or safety outcome.