Inspection Procedure

2004 Toyota Matrix XR, FWD, StandardSECTION Inspection Procedure
WARNING: This page is about a different car, the 2003 Toyota Sequoia. However, it is still accessible from the selected car via links, so may be relevant.
  1. Check voltage between terminals TPI and SG-4 of integration control and panel.Β 

    PREPARATION:

    Remove integration control and panel with connectors still connected.

    CHECK:

    1. Turn ignition switch to ON.
    2. Press REC/FRS switch to change air inlet between fresh and recirculation air, and measure voltage between terminals TPI and SG-4 of integration control and panel when the air inlet damper control servomotor operates.

    OK:

    FRS - REC SWITCH VOLTAGE

    FRS-REC Switch Voltage
    REC 3.5 - 4.5 V
    FRS 0.5 - 1.5 V
    Fig 1: Checking Voltage Between Terminals TPI And SG-4 Of Integration Control And Panel
    G02839082Courtesy of Β© TOYOTA, LICENSE AGREEMENT TMS1002
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.