Input Shaft Disassembly and Reassembly: Reassembly

2013 Suzuki Kizashi Sport GTS, FWDSECTION Reassembly
WARNING: This page is about a different variant/trim than selected.

Reference:Β INPUT SHAFT INSPECTIONΒ 

Reference:Β GEAR SHIFT SHAFT AND FORK INSPECTIONΒ 

  1. Install right bearing (1) to input shaft (2) using special tool and hydraulic press.

    Special ToolΒ 

    1. 09941-74910Β 
    Fig 1: Installing Right Bearing To Input Shaft Using Special Tool
    G06528816Courtesy of SUZUKI OF AMERICA CORP.
  2. Fit high speed synchronizer sleeve (1) to hub (2) and 3 keys (3) as shown in figure.
    NOTE:
    • No specific direction is assigned to each key but it is assigned as sleeve & hub assembly.
    • Inside diameter at high speed synchronizer hub is larger than those of low speed synchronizer hub.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.