Installation Procedure

2013 Suzuki Kizashi Sport GTS, FWDSECTION Installation Procedure
WARNING: This page is about a different car, the 2007 Suzuki XL7. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Battery Box And Mounting Bolts
G04843520Courtesy of SUZUKI OF AMERICA CORP.
  1. Position the battery box on the battery tray.
    CAUTION: Refer to FASTENER NOTICE .
  2. Install the battery box mounting bolts.

    Tightening torqueΒ 

    Tighten the bolts to 20 N.m (15 lb ft).Β 

    Fig 2: Battery Vent Tube And Battery Box
    G04843521Courtesy of SUZUKI OF AMERICA CORP.
  3. Install the battery vent tube from the battery box.
  4. Install the battery. Refer to INSTALLATION PROCEDUREΒ .
    Fig 3: Locking Clips, Battery Vent Tube And Upper Radiator Air Deflector
    G04843522Courtesy of SUZUKI OF AMERICA CORP.
  5. Lock clips (2) from the battery vent tube (1).
  6. Install the battery vent tube (1) to the upper radiator air deflector (3).
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.