2005 Suzuki Aerio L4-2.3LFACTORY OEM SERVICE PROCEDURE

Main Relay (Computer/Fuel System): Testing and Inspection

Main Relay Inspection

1. Disconnect negative cable at battery.

Factory service manual diagram



2. Remove main relay (1) from relay box (2).

Factory service manual diagram



3. Check resistance between each two terminals as follows. If check results are as specified, proceed to next operation check. If not, replace.

Main relay resistance
Between terminals "A" and "B": (Infinity)
Between terminals "C" and "C": 160 - 240 Ohms

Factory service manual diagram



4. Check that there is continuity between terminals "A" and "B" when battery is connected to terminals "C" and "D".
If found defective, replace.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.