External Connection Terminal: Installation

2016 Subaru Legacy 2.5iSECTION Installation
  1. Install the unit assembly - AUX.
  2. Install the pocket assembly - CTR.
  3. Install the panel center LWR.
  4. Install the cover assembly - front and the console box assembly.

    Tightening torque:Β 

    6.5 N.m (0.6 kgf-m, 4.8 ft-lb)Β 

  5. Install the heater control assembly.
  6. Connect the ground terminal to battery sensor. < Ref. to BATTERY , NOTE, Repair Contents. >
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.