Installation Procedure

2009 Saab 9-7X 5.3iSECTION Installation Procedure
NOTE: The molded encapsulation surrounding the quarter window is made using PVC plastic materials. Use a specific PVC primer application prior to applying the urethane adhesive bead to the window.
  1. Install the quarter window into the opening. Refer to Adhesive Installation of Encapsulated Stationary WindowsΒ .
  2. Install the inside quarter upper trim panel molding. Refer to Quarter Upper Trim Panel Replacement .
  3. Remove the double layer of masking tape around the perimeter of the painted surfaces and the interior trim.
  4. Close the liftgate.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.