Circuit/System Testing

2009 Saab 9-7X 5.3iSECTION Circuit/System Testing
  1. Ignition OFF, disconnect the yaw rate and lateral acceleration sensor connector.
  2. Ignition OFF, test for less than 1 ohm of resistance between the low reference circuit terminal 6 and ground.
    • If greater than 1 ohm, test the low reference circuit terminal 6 and the EBCM ground circuit terminal 16 for a short to voltage or an open/high resistance. If the circuits test normal, replace the EBCM.
  3. Test the lateral accelerometer signal circuit terminal 2, the 5-volt reference circuit terminal 1, and the low reference circuit terminal 6 for an open/high resistance or a short to voltage or ground.
    • If all circuits test normal, replace the yaw rate sensor/lateral acceleration sensor, and clear the yaw rate sensor offset value in the EBCM.
    • If the DTC sets again after replacing the yaw rate sensor/lateral acceleration sensor, replace the EBCM.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.