Installation Procedure

2009 Pontiac G8 BaseSECTION Installation Procedure
  1. With the aid of an assistant, install the frame to the support fixture.
  2. Fig 1: Identifying Stabilizer Bar Insulator Bracket To Subframe Retaining Nuts
    GM1943684Courtesy of GENERAL MOTORS CORP.
  3. Install the stabilizer bar to the front subframe.
  4. Install the stabilizer bar caps (2) to the front subframe
  5. NOTE: Do not fully tighten the stabilizer shaft retaining bolts to the frame at this stage.
  6. Install NEW stabilizer shaft to front sub frame retaining nuts (3).
  7. Install the engine mount to the front subframe.
  8. Install the lower engine mount to front sub frame retaining nuts (2).
  9. Carefully lower the body to the frame.
  10. Make sure the following components are clear from the frame.
    • The wheel speed sensor electrical harness
    • The steering knuckle assembly
    • The brake pipes
  11. Fig 2: Identifying Front Sub Frame To Front Chassis Rail Retaining Bolts
    GM1943720Courtesy of GENERAL MOTORS CORP.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.