Grind Complete

1984 Plymouth Voyager Base, 2.2 C, AutomaticSECTION Grind Complete
Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).

Applies ToNoteStandard HoursWarranty HoursSkill Level
2.2L Eng7.7A
Additional Procedure: VALVE: Grind Complete:
In-Line4, Where Air Pump interferes add0.20.2A
Where Air Cond interferes add0.2A
Where Power Steering interferes add0.2A
Combination Procedure: ROCKER ARM ASSEMBLY: Overhaul:
Double Rocker,Both1.5B
Double Rocker,One0.9B
Single Rocker,One0.5B
Single Rocker,Two0.9B
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.