Component Inspection

2013 Nissan-Datsun Juke SL, 4WDSECTION Component Inspection
  1. CHECK BATTERY CURRENT SENSORΒ 
    1. Turn ignition switch OFF.
    2. Reconnect harness connectors disconnected.
    3. Disconnect battery negative cable.
    4. Install jumper cable between battery negative terminal and body ground.
    5. Turn ignition switch ON.
    6. Check the voltage between ECM harness connector and ground.
      Fig 1: Installing Jumper Cable Between Battery Negative Terminal And Body Ground
      G08690399Courtesy of NISSAN NORTH AMERICA, INC.
      ECM Voltage (Approx.)
      Connector + -
      Terminal
      F26 80 87 2.5 V

      Before measuring the terminal voltage, confirm that the battery is fully charged. Refer to "HOW TO HANDLE BATTERY ".

      Is the inspection result normal?Β 

      YES: INSPECTION END

      NO: Replace battery negative cable assembly. Refer to "EXPLODED VIEW ".

RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.