Assembly Procedure

2010 Mazda 3 L4-2.5LSECTION Assembly Procedure
Assembly procedure
1. Measure the spring free length.

Primary control valve body spring (standard)





^ If not as specified, replace the springs.
2. Install the solenoid reducing valve, solenoid reducing valve spring and retainer.





3. Install the low and reverse shift valve, low and reverse shift valve spring and retainer.





4. Install the manual valve.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.