Refrigerant System General Procedures

2009 Mazda CX-9 FWD V6-3.7LSECTION Refrigerant System General Procedures



REFRIGERANT SYSTEM GENERAL PROCEDURES

Manifold Gauge Set Installation

1. Fully close the valves of the manifold gauge.

2. Connect the charging hoses to the high and low-pressure side joints of the manifold gauge.






3. Connect the quick couplers to the ends of the charging hoses.

4. Connect the quick couplers to the charging valves.

RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.