Ground Circuit Inspection

2015 Kia Optima Hybrid EXSECTION Ground Circuit Inspection
  1. IG "OFF" & Disconnect IBAU connector.
  2. Measure voltage between pin No. 14 (or pin No. 46) ground terminal of IBAU harness connector and chassis ground.

    Specification :  Below 1Ω

  3. Is the measured value within specifications?

    YES 

    NO 

    • Check the status of the AHB 10A fuse in the E/R Fuse & Relay box. Repair or replace as necessary and go to "VERIFICATION OF VEHICLE REPAIR " procedure.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • You smell fuel, burning insulation, or see smoke.
  • Brakes feel soft, pull hard to one side, or make grinding noises.
  • The engine overheats, stalls repeatedly, or misfires under load.
  • You are missing required tools, torque specs, or safe lifting equipment.
  • You are not confident in the next step or safety outcome.