Diagnostic Test

2024 Jeep Wagoneer L Series II, RWDSECTION Diagnostic Test

BSCM VERIFICATION TESTΒ 

WARNING:

To avoid possible serious or fatal injury, check brake capability is available before road testing.

  1. Connect all previously disconnected components and connectors.
    Component Routines
    NOTE:

    Perform all routines in the order listed.

    Brake System Control Module (BSCM)
    1. ABS Initialization
    2. Hydraulic Prove Out Test
    Electronic Brake Booster Unit
    1. ABS Initialization
    2. ABS Bleed Brakes
    3. Hydraulic Prove Out Test
    Occupant Restraint Controller (ORC) / Dynamics Sensor ABS Initialization
    Steering Column Control Module (SCCM) / Steering Angle Sensor (SAS) ABS Initialization
    NOTE:

    If any of the Wheel Speed Sensors (WSS) were replaced, test drive the vehicle at a speed above 25 km/h (15 mph) for several minutes.

RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.