Installation Procedure

2006 Isuzu Ascender S, 5.3 M, 4WDSECTION Installation Procedure
WARNING: This page is about a different car, the 2009 Pontiac Torrent and 2009 Chevrolet Equinox. However, it is still accessible from the selected car via links, so may be relevant.
    Fig 1: View Of EGR Valve & Pipe
    GM1087633Courtesy of GENERAL MOTORS CORP.
  1. Install the EGR pipe to exhaust manifold gasket.
  2. Install the EGR pipe (4).
  3. CAUTION: Refer to Fastener Caution .
  4. Install the 2 bolts (5) that secure the EGR pipe (4) to exhaust manifold.

    Tighten:Β  Tighten the bolts to 10 N.m (89 lb in).

  5. Install the bolt (3) the secures the EGR pipe (4) bolt to the EGR valve (1).

    Tighten:Β  Tighten the bolt to 30 N.m (22 lb ft).

  6. Install the injector sight shield. Refer to Fuel Injector Sight Shield Replacement .
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.