Power Circuit Inspection

2013 Hyundai Santa Fe XL PremiumSECTION Power Circuit Inspection
  • Circuit open Inspection 
    1. Ignition off & Engine off.
    2. Disconnected "ATM solenoid valve" connector and PCM/TCM connector.
    3. Measure resistance between power of ATM solenoid valve connector and power of TCM connector.

      Specification  : Approx. 0 Ω

    4. Is the measured resistance within specification?

      YES 

      • Go to " 22. Circuit short Inspection" procedure.

      NO 

  • Circuit short Inspection 
    1. Ignition off & Engine off.
    2. Disconnected "ATM solenoid valve connector and PCM/TCM connector".
    3. Measure a resistance between power of ATM solenoid valve connector and chassis ground.

      Specification  : Infinite

    4. Is the measured resistance within specifications?

      YES 

      • Substitute with a known-good PCM/TCM and check for proper operation. If the problem is corrected, replace PCM/TCM and then go to "VERIFICATION OF VEHICLE REPAIR " procedure.

      NO 

RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • You smell fuel, burning insulation, or see smoke.
  • Brakes feel soft, pull hard to one side, or make grinding noises.
  • The engine overheats, stalls repeatedly, or misfires under load.
  • You are missing required tools, torque specs, or safe lifting equipment.
  • You are not confident in the next step or safety outcome.