Signal Circuit Inspection

2013 Hyundai Genesis Coupe 2.0T R-SpecSECTION Signal Circuit Inspection
  1. IG KEY OFF.
  2. Disconnect OTS connector.
  3. Measure resistance between OTS signal terminal of OTS harness connector and chassis ground.

    Specification:  5V

    Fig 1: Measuring Resistance Between OTS Signal Terminal Of OTS Harness Connector & Chassis Ground
    G00520321Courtesy of HYUNDAI MOTOR CO.
  4. Is voltage within specification?

    YES 

    • Go to next Inspection procedure.

    NO 

RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • You smell fuel, burning insulation, or see smoke.
  • Brakes feel soft, pull hard to one side, or make grinding noises.
  • The engine overheats, stalls repeatedly, or misfires under load.
  • You are missing required tools, torque specs, or safe lifting equipment.
  • You are not confident in the next step or safety outcome.