Power Circuit Inspection

2011 Hyundai Santa Fe GLS, 3.5 G, AWDSECTION Power Circuit Inspection
WARNING: This page is about a different variant/trim than selected.
  • Check for Short to Ground in Power Circuit 
    1. IG KEY OFF.
    2. Disconnect PCM and APS harness connector.
    3. IG KEY ON.
    4. Measure resistance between APS1 power terminal of APS harness connector and chassis ground.

      Specification :  Infinite

      Fig 1: Measuring Resistance Between APS1 Power Terminal Of APS Harness Connector And Chassis Ground
      G06841449Courtesy of HYUNDAI MOTOR CO.
    5. Is resistance within specification?

      YES 

      • Go to next procedure.

      NO 

  • Check for Open in Power circuit 
    1. IG KEY OFF.
    2. Disconnect APS harness connector.
    3. IG KEY ON.
    4. Measure voltage between APS1 power terminal of APS harness connector and chassis ground.

      Specification :  Approx. 5V

      Fig 2: Measuring Voltage Between APS1 Power Terminal Of APS Harness Connector And Chassis Ground
      G06841450Courtesy of HYUNDAI MOTOR CO.
    5. Is voltage within specification?

      YES 

      • Go to next procedure.

      NO 

RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • You smell fuel, burning insulation, or see smoke.
  • Brakes feel soft, pull hard to one side, or make grinding noises.
  • The engine overheats, stalls repeatedly, or misfires under load.
  • You are missing required tools, torque specs, or safe lifting equipment.
  • You are not confident in the next step or safety outcome.