Actuator Control Sequence Procedure

1994 Hyundai Scoupe Base, AutomaticSECTION Actuator Control Sequence Procedure
  1. Ensure ignition switch is in OFF position. Connect jumper wire to diagnostic connector terminal No. 10 and vehicle ground. See Figure . Turn ignition switch to ON position. Disconnect ground wire in 2.5-4.0 seconds. Actuator test should start. See ACTUATOR TEST SEQUENCE table.
  2. To proceed with next test, ground jumper wire for 2.5-4.0 seconds. If jumper wire is grounded longer than 4 seconds, test sequence will start from beginning. Continue to ground jumper wire until 3333 (end of output) is flashed.
ACTUATOR TEST SEQUENCE

Activated Component Sequence No. Flash Code
Injector No. 1 1 1312
Injector No. 3 2 1314
Injector No. 4 3 1313
Injector No. 2 4 1315
IAC Motor 5 1321
Purge Control Valve 6 1322
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.