Cylinder Head Installation

2009 Honda S2000 BaseSECTION Cylinder Head Installation
  1. Measure the diameter of each cylinder head bolt at point A and point B. If either diameter is less than 11.5 mm (0.45 in.), replace the cylinder head bolt.
    Fig 1: Identifying Diameter Of Each Cylinder Head Bolt At Point A And Point B
    G03692374Courtesy of AMERICAN HONDA MOTOR CO., INC.
  2. Clean and dry the cylinder head, engine block, and chain case mating surfaces.
  3. Apply liquid gasket, P/N 08717-0004,08718-0001, 08718-0003, or 08718-0009, to the shaded areas (A) of the cylinder head gasket mating surface of the engine block and chain case.
    NOTE: Do not install the parts if 5 minutes or more have elapsed since applying liquid gasket. Instead, reapply liquid gasket after removing the old residue.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.