1990 Geo Tracker LSi, AutomaticFACTORY OEM SERVICE PROCEDURE

Front Toe-In Adjustment: Metro

Adjust front wheel toe-in by changing tie rod length. Loosen right and left tie rod end lock nuts. Turn right and left tie rods by the same amount to adjust toe-in to specification. See appropriate table under WHEEL ALIGNMENT SPECIFICATIONSΒ . Right and left tie rod length "A" should be the same. See Figure. Tighten tie rod end nuts to specification. See TORQUE SPECIFICATIONSΒ .

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.