Installation Procedure

2013 GMC RV Cutaway 4.8L Eng VIN ASECTION Installation Procedure
    Fig 1: Low Pressure Switch And Electrical Connector
    GM924798Courtesy of GENERAL MOTORS COMPANY
  1. Install the new O-ring seal to the switch. Refer to Air Conditioning O-Ring Seal ReplacementΒ .
  2. CAUTION:

    Refer to Fastener Caution .

  3. Install the A/C low pressure switch (1) to the accumulator and tighten to 4 N.m (35 lb in) .
  4. Connect the low pressure switch electrical connector (2).
  5. Leak test the fittings of the component using the J 39400-AΒ  detector.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.