Assembly Procedure

2011 GMC Savana Special 4.8 ASECTION Assembly Procedure
WARNING: This page does not describe the selected car, but rather 6 other vehicles, including the 2010 GMC Savana Special, 2010 GMC Savana Camper Special, 2010 GMC Savana, 2010 Chevrolet RV Cutaway, and 2010 Chevrolet Cutaway. However, it is still accessible from the selected car via links, so may be relevant.
    Fig 1: View Of Power Steering Pump Control Valve Assembly
    GM580317Courtesy of GENERAL MOTORS CORP.
  1. Ensure the flow control spring (5) does not fall out of the pump housing (1).
  2. Lubricate the NEW O-ring seal (3) with power steering fluid.
  3. Install the O-ring seal onto the connector and fitting assembly (2).
  4. Install the control valve assembly (4).
  5. CAUTION: Refer to Fastener Caution .
  6. Install the connector and fitting assembly (2) and tighten to 62 N.m (46 lb ft).
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.