Circuit/System Verification (Battery, Charging System And Starting System)

2011 GMC Savana Special 4.8 ASECTION Circuit/System Verification (Battery, Charging System And Starting System)
WARNING: This page does not describe the selected car, but rather 6 other vehicles, including the 2010 GMC Savana Special, 2010 GMC Savana Camper Special, 2010 GMC Savana, 2010 Chevrolet RV Cutaway, and 2010 Chevrolet Cutaway. However, it is still accessible from the selected car via links, so may be relevant.
  1. Verify DTC P0563 is set as current.
  2. Engine running measure and record the voltage at the battery terminals. Verify that the battery voltage is 12.6-15.5 V.
  3. Engine running, observe the scan tool ECM Ignition 1 signal parameter.
  4. Verify the battery and Ignition 1 signal readings do not differ more than 2.0 V.
    • If greater than specified value, replace the ECM.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.