Installation Procedure (Battery, Charging System And Starting System)

2010 GMC Savana Special 4.8 ASECTION Installation Procedure (Battery, Charging System And Starting System)
    Fig 1: View Of Battery Hold-Down Retainer Bolt & Retainer
    GM1202786Courtesy of GENERAL MOTORS CORP.
  1. Install the battery into the battery tray.
  2. CAUTION: Refer to Fastener Caution .
  3. Install the battery hold-down retainer and bolt and tighten to 18 N.m (12 lb ft).
  4. Fig 2: Identifying Battery & Cables
    GM1202776Courtesy of GENERAL MOTORS CORP.
  5. Connect the battery positive cable and the positive battery cable terminal to the battery. Refer to Battery Positive Cable Replacement (With LMM Primary)Β  or Battery Positive Cable Replacement (With LU3)Β  or Battery Positive Cable Replacement (With LMM Auxiliary)Β  or Battery Positive Cable Replacement (With LY2, LME or LY6)Β .
  6. Connect the battery negative cable and the negative battery cable terminal to the battery. Refer to Battery Negative Cable Disconnection and ConnectionΒ .
  7. Install the fender brace.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.