Installation Procedure

2010 GMC Savana Special 4.8 ASECTION Installation Procedure
    Fig 1: Identifying Cargo Lamp
    GM820739Courtesy of GENERAL MOTORS CORP.
  1. Install the light assembly into the vehicle with double sided tape.
  2. IMPORTANT: In order to insure a good replacement of new adhesive or of old adhesive, verify that the surface meets the following conditions:
    • The temperature of the surface is approximately 24-41Β°C (80-105Β°F).
    • The surface is clean.
    • The surface is free of wax or of oily film.
  3. Connect the electrical connector.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.