Removal Procedure

2009 GMC Canyon 4D Pickup, 2.9 9SECTION Removal Procedure
WARNING: This page is about a different variant/trim than selected.
    Fig 1: ECM Connector & CPA Retainer
    GM1897080Courtesy of GENERAL MOTORS CORP.
  1. Using a scan tool, retrieve the percentage of remaining engine oil. Record the remaining engine oil life.
  2. Remove the windshield washer solvent container. Refer to Windshield Washer Solvent Container Replacement .
  3. Disengage the integral connector position assurance (CPA) retainer (1) on the body wiring harness electrical connector.
  4. Disconnect the body wiring harness electrical connector (2) from the ECM.
  5. Fig 2: ECM Connector
    GM1897083Courtesy of GENERAL MOTORS CORP.
  6. Disengage the integral CPA retainers on the engine wiring harness electrical connectors.
  7. Disconnect the engine wiring harness electrical connectors (2) from the ECM.
  8. Fig 3: ECM & Bracket Tabs
    GM1897085Courtesy of GENERAL MOTORS CORP.
  9. Lift up the ECM bracket tabs (2) and tilt the ECM (1) towards the front of the vehicle, removing the ECM (1).
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.