  1. Ignition OFF, disconnect the harness connector at the ECT sensor.
  2. Ignition OFF for 90 seconds, test for less than 5 ohms of resistance between the low reference circuit terminal A and ground.
    • If greater than the specified range, test the low reference circuit for an open/high resistance. If the circuit tests normal, replace the ECM.
  3. Ignition ON, verify the scan tool ECT Sensor parameter is colder than -39Β°C (-38Β°F).
    • If warmer than the specified range, test the signal circuit terminal B for a short to ground. If the circuit tests normal, replace the ECM.
  4. Install a 3A fused jumper wire between the signal circuit terminal B and the low reference circuit terminal A. Verify the scan tool ECT Sensor parameter is warmer than 149Β°C (300Β°F).
    • If colder than the specified range, test the signal circuit for a short to voltage or an open/high resistance. If the circuit tests normal, replace the ECM.
  5. If the circuits test normal, test or replace the ECT sensor.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.