Installation Procedure

2009 GMC Canyon 4D Pickup, 2.9 9SECTION Installation Procedure
WARNING: This page is about a different variant/trim than selected.
    Fig 1: Locating Air Injection (AIR) Check Valve Gasket
    GM1749363Courtesy of GENERAL MOTORS CORP.
  1. Place a NEW AIR check valve gasket (1) between the engine and the valve.
  2. Position the AIR check valve (2) to the engine.
  3. CAUTION: Refer to Fastener Caution .
  4. Install the AIR check valve studs (3).

    Tighten:Β  Tighten to studs to 25 N.m (18 lb ft).

  5. Fig 2: Locating Air Injection (AIR) Check Valve & Studs
    GM1749361Courtesy of GENERAL MOTORS CORP.
  6. Connect the engine wiring harness electrical connector (1) to the AIR check valve.
  7. Fig 3: Locating Air Injection (AIR) Pump Outlet Hose
    GM1749355Courtesy of GENERAL MOTORS CORP.
  8. Connect the AIR pump outlet hose quick connect fitting to the AIR check valve. Refer to Plastic Collar Quick Connect Fitting ServiceΒ .
  9. Install the air cleaner outlet duct. Refer to Air Cleaner Outlet Duct Replacement .
  10. Close the hood.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.