Installation Procedure

2009 GMC Canyon 4D Pickup, 2.9 9SECTION Installation Procedure
    Fig 1: View Of BCM
    GM1283835Courtesy of GENERAL MOTORS CORP.
  1. Position the BCM to the vehicle.
  2. Attach the BCM to the hinge pillar with the integral tab.
  3. Install the 2 fasteners retaining the BCM to the hinge pillar.
  4. Fig 2: View Of Detached Body Wiring Harness Electrical Connector
    GM1283832Courtesy of GENERAL MOTORS CORP.
  5. Install the fastener retaining the body wiring harness electrical connector to the BCM.
  6. Fig 3: View Of Body Wiring Harness Electrical Connector
    GM1283827Courtesy of GENERAL MOTORS CORP.
  7. Connect the body wiring harness electrical connector (1) to the BCM.
  8. Fig 4: View Of I/P Wiring Harness Electrical Connector
    GM1283829Courtesy of GENERAL MOTORS CORP.
  9. Connect the I/P wiring harness electrical connector (1) to the BCM.
  10. Install the right front hinge pillar trim panel. Refer to Body Hinge Pillar Trim Panel Replacement - Right Side .
  11. If installing a replacement BCM, program the BCM. Refer to Control Module References .
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.