Generator Battery Control Module Replacement (4 and 5 Cylinder)

2009 GMC Canyon 4D Pickup, 2.9 9SECTION Generator Battery Control Module Replacement (4 and 5 Cylinder)
Fig 1: Generator Battery Control Module
GM2135616Courtesy of GENERAL MOTORS CORP.
Callout Component Name

Preliminary Procedure

  1. Disconnect the battery negative cable. Refer to Battery Negative Cable Disconnection and ConnectionΒ .
  2. Remove the positive and negative battery cables. Refer to Battery Positive and Negative Cable Replacement (LLV/LLR)Β 
1 Generator Battery Control Module

Procedure

  1. Separate the negative battery cable from the positive cable.
  2. Mark the position of the generator battery control module before removing it from the battery negative cable.
  3. NOTE: always use new tape and retainers when installing the generator battery control module.
  4. Remove the tape and retainers holding the module in place.
  5. Slide the module down the negative cable routing any additional cables through the module loop.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.