Module, Drivetrain Control (DTCM): Installation

2023 Dodge and Ram Charger R/TSECTION Installation
GC0095226Courtesy of CHRYSLER GROUP, LLC
  1. Position the Drivetrain Control Module (DTCM) (3) onto the mounting studs (5) and (6).
  2. Install the DTCM mounting fasteners (2) and (4) and tighten to the proper torque specifications. Refer to TORQUE SPECIFICATIONSΒ .
  3. Secure the driver footwell carpet back to its installed position.
  4. Install the cowl side trim panel (1). Refer to PANEL, COWL TRIM, INSTALLATION .
  5. Connect the negative battery cable. If equipped with an Intelligent Battery Sensor (IBS), connect the IBS connector.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.