Installation - 2.0L

2005 Dodge and Ram Neon SE, StandardSECTION Installation - 2.0L
  1. Install the assembly, PCM and bracket.
  2. Loose install the mounting nut.
  3. Install the mounting bolts to the bottom of the PCM bracket. See Figure.
  4. Tighten the mounting nut, tighten to
  5. Install the wiring harness clip to the PCM bracket. See Figure.
    NOTE: The electrical connector for the PCM are COLOR Coded.
  6. Connect the electrical connectors and lock at the PCM. See Figure.
  7. Install the air cleaner box, refer to AIR CLEANER HOUSING (2.0) or AIR CLEANER HOUSING (2.4) for more information. See Figure.
  8. Connect the negative battery cable.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.