2008 Chrysler Sebring Limited, 2D ConvertibleFACTORY OEM SERVICE PROCEDURE

Fuel Injection-Gasoline: Specifications: Torque

TORQUE SPECIFICATIONS

DESCRIPTION  N.m  Ft. Lbs.  In. Lbs. 
Accelerator Pedal Nuts 16 12 -
Crankshaft Position Sensor Bolt 9 - 79.5
Battery Cable Nut 5 - 45
Lower Throttle Body Support Bracket Nut 2.7L 28 20.5 -
MAP Sensor Bolt 4.5 - 40
Oxygen Sensor (All) 41 30 -
Power Steering Reservoir Plastic Manifold 5.7 - 50
Power Steering Reservoir Aluminum Manifold 11.9 - 105
Throttle Body Bolts 4-Cylinder 7.5 - 65
Throttle Body Bracket Bolt 4-Cylinder 25 18 -
Throttle Body Bolts 2.7L, 3.5L Engines 5.5 - 50
Throttle Body Stud 2.7L Engine 5.5 - 50
Upper Throttle Body Support Bracket Nut 2.7L 12 - 105
The composite manifold uses special plastic screws. The factory installed plastic screws can be removed and installed up to 5 times. Do not exceed the specified torque. These screws must be installed slowly (less than 600 RPM) to avoid melting the parent material. There are service repair screws available for repair. They require a higher torque than the original screws.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.