2008 Chrysler Crossfire V6-3.2LFACTORY OEM SERVICE PROCEDURE

Oil Pan, Engine

LOWER OIL PAN

Install the lower oil pan and oil pan bolts. Tighten the lower oil pan bolts to 14 Nm (10 ft. lbs.).

UPPER OIL PAN

Factory service manual diagram




1. Install the oil pan bolts with the proper size and length bolt in the correct bolt hole.
- (1) M6 X 20
- (2) M6 X 40
- (3) M6 X 90
- (4) M8 X 30

2. Tighten the M6 size bolts to 10 Nm (89 in. lbs). Follow the tightening sequence diagram.
3. Tighten the M8 size bolts to 20 Nm (15 ft. lbs.). Follow the tightening sequence diagram.
Chapter Navigation
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.