2008 Chrysler 300 V6-2.7LFACTORY OEM SERVICE PROCEDURE

Installation







INSTALLATION

Factory service manual diagram




NOTE: A battery reconnect procedure must be performed anytime the battery has been disconnected. Battery Reconnection.

1. Position Integrated Power Module (IPM) to vehicle. Engage the three retaining clips.
Factory service manual diagram




2. Disengage the outboard retaining clip and rotate the IPM to access wire harness connectors.
3. Connect electrical harness connectors to IPM.
Factory service manual diagram




4. Connect battery cable to IPM.
5. Install and tighten retaining nut.
6. Close the battery cable nut cover.
Factory service manual diagram




7. Connect battery negative cable (2).
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.