Structural Collar/Cover: Installation

2004 Chrysler PT Cruiser Touring, 2.4 B, AutomaticSECTION Installation
WARNING: This page is about a different car, the 2003 Dodge Intrepid, 2003 Chrysler Intrepid, and 2003 Chrysler Concorde. However, it is still accessible from the selected car via links, so may be relevant.
CAUTION: The collar must be tighten using this service procedure, as damage to collar and/or oil pan may occur.
  1. Install structural collar (Figure) using the following tightening sequence:
    1. Install the vertical  collar to oil pan bolts. Torque bolts initially to 1.1 N.m (10 in. lbs.).
    2. Install the horizontal  collar to transmission bolts and torque to 55 N.m (40 ft. lbs.).
    3. Starting with the center vertical bolts and working outward, final torque bolts to 55 N.m (40 ft. lbs.).
  2. Lower vehicle.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • You smell fuel, burning insulation, or see smoke.
  • Brakes feel soft, pull hard to one side, or make grinding noises.
  • The engine overheats, stalls repeatedly, or misfires under load.
  • You are missing required tools, torque specs, or safe lifting equipment.
  • You are not confident in the next step or safety outcome.