2002 Chrysler Neon LE, AutomaticFACTORY OEM SERVICE PROCEDURE

Solenoid/Pressure Switch Assembly: Installation

NOTE: If solenoid/pressure switch assembly is being replaced, it is necessary to perform the TCM Quick Learn Procedure. Refer to DIAGNOSIS - 41TE article.
  1. Install solenoid/pressure switch assembly and new gasket to transaxle. (Fig 1).
    Fig 1: Installing Solenoid/Pressure Switch Assembly & Gasket
    G01031274Courtesy of DAIMLERCHRYSLER CORP.
  2. Install and torque three (3) bolts (Figure) to 13 N.m (110 in. lbs.).
  3. Install input speed sensor (Figure) and torque to 27 N.m (20 ft. lbs.).
  4. Connect input speed sensor connector.
  5. Install solenoid/pressure switch 8-way connector and torque to 4 N.m (35 in. lbs.).
  6. Install air cleaner/throttle body assembly.
  7. Connect battery negative cable.
  8. If solenoid/pressure switch assembly was replaced, perform TCM Quick Learn procedure. Refer to DIAGNOSIS - 41TE article.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.